

We chose to devise two separate risk assessments for each location we were going to film at. This was because as one is indoor and one is outdoor we felt that each of the two locations presented their own, very different, risks and possible hazards. Due to this we wrote two risk assessments: one for our exterior shots and one for our interior shots.
No comments:
Post a Comment